Plan your gym opening
Six questions, no email gate: your next three actions for exactly where you are, the nine-stage checklist, and — if you have a date — a countdown laid back from opening month. Every action links the tool or guide that does it.
The nine stages your plan sequences
Answer the six questions above and the plan orders these for your gym type, stage and date — with the next three actions on top.
Write the brief in numbers — floor area, every powered system, price, opening date — before anything is signed.
Run candidate sites through the cheap checks first: power, floor, permitted use — before the lease.
Council pathway, certifier, WHS regulator, insurer, OneMusic and membership terms under the ACL.
Build the full cost stack with sourced rates, do the break-even ramp arithmetic, then get written finance quotes.
Draw the floor at true scale, put floor loading in front of a structural engineer, export the pack for builder quotes.
Shortlist manufacturers, send the same RFQ to each, and turn FOB quotes into landed cost.
Stand up billing, access, bookings, pipeline and money visibility; check award rates before modelling the roster.
8.Pre-sale
Set the pre-sale target from break-even, keep the founding terms honest, count weekly.
Run the 13-week numbers page and re-run the calculator at week six with real figures.